{"id":1,"date":"2019-12-29T02:36:35","date_gmt":"2019-12-29T08:36:35","guid":{"rendered":"https:\/\/host2004\/cgi\/addon_GT.cgi?s=GT::WP::Install::EIG+%28aieimxco%29+-+10.0.87.66+%5BWordPress%3b+\/var\/hp\/common\/lib\/WordPress.pm%3b+258%3b+Hosting::gap_call%5D\/?p=1"},"modified":"2021-09-13T15:41:17","modified_gmt":"2021-09-13T21:41:17","slug":"upgrade","status":"publish","type":"post","link":"https:\/\/aiei.mx\/en\/blog\/2019\/12\/29\/upgrade\/","title":{"rendered":"Upgrade"},"content":{"rendered":"Language &nbsp;<a href=\"https:\/\/aiei.mx\/en\/blog\/2019\/12\/29\/upgrade\/\" title=\"English\" class=\"current_language\" aria-current=\"page\"><img data-recalc-dims=\"1\" decoding=\"async\" src=\"https:\/\/i0.wp.com\/aiei.mx\/en\/wp-content\/plugins\/multisite-language-switcher\/assets\/flags\/us.png?w=678&#038;ssl=1\" alt=\"en_US\"\/> English<\/a>&nbsp;&nbsp;<a href=\"https:\/\/aiei.mx\/\" title=\"Espa\u00f1ol\"><img data-recalc-dims=\"1\" decoding=\"async\" src=\"https:\/\/i0.wp.com\/aiei.mx\/en\/wp-content\/plugins\/multisite-language-switcher\/assets\/flags\/mx.png?w=678&#038;ssl=1\" alt=\"es_MX\"\/> Espa\u00f1ol<\/a>&nbsp;\n\n\n<p class=\"wp-block-paragraph\">Upgrade your equipment is a must for the correct operation in any factory. Sometimes the equipment may be in working conditions but some other machines may not be in optimal condition and yet, a small failure can cause several days off because the lack of spare parts, documentation or not well documented modifications. In several cases, machines have old PLCs without software backups, the programming software no longer works on current operating systems or interface cables are hard to get.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Everyone who has been in the industry some time knows that this is a cyclic process that doesn&#8217;t have to be complicated. Develop a plan and a strategy that let us reduce the upgrade time, listening carefully to the production department, is a key element.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"678\" height=\"287\" src=\"https:\/\/i0.wp.com\/aiei.mx\/en\/wp-content\/uploads\/sites\/6\/2020\/05\/Ambos-1.jpg?resize=678%2C287&#038;ssl=1\" alt=\"\" class=\"wp-image-201\" srcset=\"https:\/\/i0.wp.com\/aiei.mx\/en\/wp-content\/uploads\/sites\/6\/2020\/05\/Ambos-1.jpg?resize=1024%2C434&amp;ssl=1 1024w, https:\/\/i0.wp.com\/aiei.mx\/en\/wp-content\/uploads\/sites\/6\/2020\/05\/Ambos-1.jpg?resize=300%2C127&amp;ssl=1 300w, https:\/\/i0.wp.com\/aiei.mx\/en\/wp-content\/uploads\/sites\/6\/2020\/05\/Ambos-1.jpg?resize=768%2C326&amp;ssl=1 768w, https:\/\/i0.wp.com\/aiei.mx\/en\/wp-content\/uploads\/sites\/6\/2020\/05\/Ambos-1.jpg?w=1174&amp;ssl=1 1174w\" sizes=\"auto, (max-width: 678px) 100vw, 678px\" \/><figcaption>Migration: Siemens S5 to S7<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Tenemos la experiencia para actualizar los sistemas de control basados en PLC o SCADA a nuevas versiones o cambio a nuevas tecnolog\u00edas. Nuestro equipo de ingenieros revisa los detalles, visibles y ocultos, que se encuentran en la operaci\u00f3n del sistema tratando de mantener aquellos elementos a los que los operadores y el personal de mantenimiento est\u00e1n acostumbrado, reduciendo el tiempo de capacitaci\u00f3n.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Upgrade your equipment is a must for the correct operation in any factory. Sometimes the equipment may be in working conditions but some other machines may not be in optimal condition and yet, a small failure can cause several days off because the lack of spare parts, documentation or not well documented modifications. In several [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":194,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"footnotes":""},"categories":[3],"tags":[],"class_list":["post-1","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-proyectos"],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/aiei.mx\/en\/wp-content\/uploads\/sites\/6\/2019\/12\/FotoBlog01.jpg?fit=500%2C500&ssl=1","_links":{"self":[{"href":"https:\/\/aiei.mx\/en\/wp-json\/wp\/v2\/posts\/1","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aiei.mx\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aiei.mx\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aiei.mx\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/aiei.mx\/en\/wp-json\/wp\/v2\/comments?post=1"}],"version-history":[{"count":5,"href":"https:\/\/aiei.mx\/en\/wp-json\/wp\/v2\/posts\/1\/revisions"}],"predecessor-version":[{"id":396,"href":"https:\/\/aiei.mx\/en\/wp-json\/wp\/v2\/posts\/1\/revisions\/396"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aiei.mx\/en\/wp-json\/wp\/v2\/media\/194"}],"wp:attachment":[{"href":"https:\/\/aiei.mx\/en\/wp-json\/wp\/v2\/media?parent=1"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aiei.mx\/en\/wp-json\/wp\/v2\/categories?post=1"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aiei.mx\/en\/wp-json\/wp\/v2\/tags?post=1"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}